Lead flashing dressed neatly around a chimney stack on a freshly tiled roof.
Completed slate re-roof with a dry ridge system and a Velux roof window.
Finished slate roof and stone gable end, shot from the scaffold.
Newly laid slate tiles finishing clean at the gable ridge.
Slate re-roof in progress — battens and membrane going down around a Velux.
Pitched roof stripped back to the rafters, with the opening cut for a roof window.
New OSB decking laid on a flat roof replacement, ready for the finish.
Flat roof stripped back to the joists, ready for re-boarding.
Stripping out perished felt on a flat roof — the rotten timber exposed underneath.
New mineral felt laid and finished on a flat roof, watertight and tidy.
Stone property re-roofed top to bottom, scaffolded the full height of the house.
Newly tiled pitched roof laid fresh, viewed from the scaffold.
Dual-pitched slate re-roof finished against a new brick gable end.
Re-roof in progress — new tiles going down against the brickwork.
New flat roof finished and sealed to the brick wall with fresh lead flashing.
Continuous lead flashing dressed where the tiles meet a brick wall.
Lead flashing dressed around a chimney stack, up the ladder.
Lead flashing detailed in against the brickwork and downpipe.
A weathered chimney before we started — lichen in the mortar, flashings past their best.
Same sort of chimney, freshly repointed and sealed — the after.
Lead valley laid where two roof pitches meet — watertight junction.
New tiled roof finished with a central valley and black fascias, shot from the scaffold.
Finished pitch with ridge tiles, new downpipe and fascia all neat against the brick.
Completed roof valley looking down from the ridge, flashing dressed in clean.
Internal valley junction finished, tiles cut tight to the metal lining.
New roof trusses set on the wall plate, ready to be boarded and tiled.
Roof skeleton going up — trusses in, scaffold round it.
Rafters laid out across the span, brick walls up and waiting for the tiles.
Single-pitch lean-to roof tiled and flashed tight to the brick wall.
Dry ridge system clipped down the centre of a fresh tiled roof.
Completed pitch with the ridge vented and clipped, ready to hand over.
Repair in progress — old tiles stripped back to the battens and membrane.
Looking down a finished re-roof from the ridge to the eaves.
Clay tiles laid up to a brick chimney, lead flashing dressed in at the base.
Hip ridge capped and clipped, tiles cut in round the chimney stack.
Gable finished with dry verge trims, slate run meeting the flat roof below.
Fresh tiles on a finished pitch, caught in the sun from the scaffold.
Membrane down and treated battens on, ready for the tiles.
Chimney stack re-sealed at the base, old aerial bracket left as found.
Hip ridge vented and sealed where the clay tiles meet, detail from the roof.
Re-roof in progress up to a brick chimney, scaffold set at the eaves.
Repair under way — tiles stripped back, membrane and battens exposed.
Ridge tiles clipped between two brick chimneys, lead flashed at both bases.
Y-shaped ridge junction clipped and sealed where three pitches meet.
Brickwork cleaned back ready for repointing, scaffold set against it.
Terracotta ridge capped and vented down the length of the roof.
Chimney stack re-flashed at the base, cap weathered and bracket secured.
Membrane down and battens on, tiles stacked and ready to lay.
Finished slate section with hips clipped and the vent pipe dressed through.
Dry-fix ridge clipped down between two lead-flashed brick chimneys.
Breather membrane and battens down on a complex pitch, ready to tile.
Dark tiles laid up to two Velux roof windows, flashed in flush.
Solar panel installation on the front pitch of a two-storey brick house, scaffolded front and side.
Rear elevation re-roof with black solar panels fitted flush to the tiled pitch.
Solar panels and scaffolding to the rear elevation of a two-storey brick house.
Roofing installation at the rear of the property showing new fascia and guttering.
Re-roof under way — scaffold up, membrane and battens down, Marley tiles stacked and ready to lay.
Completed flat roof section finished up against a pitched tiled roof.
Roof renovation — valley and black flashing dressed where two roof pitches meet.
Re-roof in progress — new battens and vapour-permeable underlay on the stone gable end.
Re-roof in progress — concrete tiles being laid in a staggered run across the battens.
Completed solar panel installation on the main pitch, with the tiled extension roof below.
Re-roof in progress — new red concrete tiles laid on the left pitch, old grey tiles still on the right.
Brick gable end finished with a new timber fascia board, guttering and downpipe.
Re-roof under way — vapour-permeable underlay and battens down, dark tiles going on against the old covering.
Chimney stack opened up for a new flue liner, tiles stripped back round the stack.
Finished chimney stack with fresh lead apron flashing dressed in against new red clay tiles.
Roof valley lined and ready to tile — battens on, dark tiles meeting at the valley centre.
Completed grey tiled roof with a black dry-ridge system clipped down the centre line.
New dark tiles on a lean-to extension, lead-flashed where the slope meets the brick wall.
Weathered chimney stack with a flue liner fitted, pointing and flashings due for renewal.
Dry ridge system being fitted — black ventilated ridge roll laid along the peak of the roof.
Re-roof in progress — Corotop membrane and battens down across a complex multi-pitch roof.
Re-roof mid-stage — dark tiles going down the right slope, membrane and battens still showing on the left.
Finished dark tiled roof with a clipped dry ridge and two lined valleys running to the eaves.
Completed charcoal tiled pitch finished at the brick gable end with a black fascia board.
Completed grey tiled roof with a dry ridge system clipped down the centre, shot from the scaffold.